Work Packages
ReMFra project | Recovering metals and mineral fraction from steelmaking residues
The eight packages
The ReMFra project is devided into 8 work packages to achieve the pinned up goals.
WP1
All the activities during the
project will be supported
by the project coordinator
in WP1, in which the
consortium will provide
the required tools, an
administrative, financial
and technical
management to ensure
project development.
WP2
In WP2, the consortium
will classify the residue
and a preliminary analysis
on the requirements of
feed material of both
processes will be carried
out.
WP3
The pre-treatment process
required will be defined in
WP3, based on previous
activities, with engineering
and plant design.
WP4
Once the overall process is
defined, the industrial
demonstration solution
purchasing, erection, and
commissioning, can be
carried out in WP4.
WP5
The demonstration
campaigns for Plasma
Reactor and RecoDust use
cases will take place in
WP5, together with the
analyses of other
industrial partners
residues and several
operative conditions.
WP6
All the information and
results of the previous
WPs will be gathered and
analysed in WP6, in which
the KPIs of the project will
be updated regularly.
WP7
WP7 will be devoted to
deliver all the assessment,
such as LCA LCC and EHS
analysis.
WP8
Finally, Dissemination,
Exploitation and
Communication (DEC)
activities will be developed
in WP8, ensuring to reach
the widest possible
audience, and identifying
the most appropriate
paths to maximize the
impacts.